The Mead-Adelanto Transmission Project is a 202 mile, 500 kV alternating current transmission line that extends between a southwest terminus at the Adelanto substation in Southern California and a northeast terminus at Marketplace Substation approximately 17 miles southwest of Boulder City, Nevada. By connecting to the Marketplace Substation, the transmission line interconnects with the Mead-Phoenix Tranmission Project and the McCullough Substation in Southern Nevada. The transmission line has a transfer capability of 1,291 MW. The commercial operation date for the Mead-Adelanto Project was April 15, 1996.
© 2024 SCPPA . All rights reserved. | SCPPA